Stoke-on-Trent · Staffordshire

Electricians in Stoke-on-Trent

Rewires, consumer units, EICR certificates, lighting and EV chargers — carried out and certificated by our electricians as part of the wider renovation team.

Certificated & notified
Landlord EICRs
Fixed written quotes
First fix electrical cabling run through timber joists before boarding
What we do

Domestic electrical work, certificated

From a single socket to a full rewire. Everything notifiable is certificated and registered, so it is there in black and white when you come to sell or let.

Consumer unit with RCD protection and a labelled circuit chart in an under-stairs cupboard
Rewires & consumer units

Boards live under the stairs, not in a showroom. Wherever yours is, every circuit gets tested, labelled and written onto the schedule.

Kitchen lighting with recessed downlights, under-cabinet LED strip and a pendant over a breakfast bar
Lighting & power

Downlights, under-cabinet strip, outdoor power and extra sockets — planned alongside the kitchen rather than after it.

Multifunction electrical test instrument with leads connected to an open consumer unit
EICR & landlord testing

Five-yearly inspection reports for rental property, with any remedial work quoted separately so you can decide.

Electrical services

What we take on

Full & partial rewires

New circuits throughout, or just the parts that need it. Chased in and made good, so you are not left with the plastering.

Consumer unit upgrades

Replacing old boards with a metal unit and proper RCD protection, tested and certificated with a full circuit schedule.

EICR & landlord certificates

The five-yearly report required for rental property, with any C1 or C2 items itemised and priced separately.

Lighting design

Downlights, under-cabinet strip, wall lights and dimming. Planned as layers rather than defaulting to a grid of spots.

Sockets, switches & outdoor power

Extra sockets, USB points, garden and garage supplies, and moving the ones that ended up behind the sofa.

EV charger installation

Home and workplace charging, surveyed properly and fully certificated.

EV Charger Installation Stoke-on-Trent →
Landlords & HMOs

EICRs turned round between tenancies

Every rented property in England needs an Electrical Installation Condition Report at least every five years, and at the start of a new tenancy if the existing one has run out. It is a legal requirement, not a recommendation, and the penalties for not having one are considerably more expensive than the report.

With Staffordshire University and Keele on the doorstep, a large share of the housing in Shelton, Hartshill, Penkhull and around Newcastle-under-Lyme turns over on the same few weeks each summer. That is a narrow window, and a report that comes back with remedial work in it can wreck a move-in date.

So we do two things differently. We book landlord work around the changeover rather than into it, and where a report throws up C1 or C2 items we quote them there and then instead of leaving you to find another electrician mid-void.

What the codes actually mean

C1 — danger present. Requires immediate action, and the report cannot be satisfactory until it is dealt with.

C2 — potentially dangerous. Also makes the report unsatisfactory and has to be put right within 28 days.

C3 — improvement recommended. Does not make the report unsatisfactory, and you are not obliged to act on it.

Worth knowing, because a long list of C3s can look alarming on paper and be sold to you as urgent work. We will always tell you which items you actually have to do.

Local knowledge

Wiring in Stoke-on-Trent houses

A large part of the housing stock in Burslem, Tunstall, Longton and Fenton predates the war, and plenty of it has never been fully rewired — just added to. What we find behind the plaster is usually a mix: a modern kitchen circuit, an eighties ring main, and somewhere in the middle a length of rubber or fabric-sheathed cable from the original installation that has gone brittle.

Boards tell the same story. We regularly open up a rewireable fuse box with no RCD protection at all, or a split-load unit from the nineties that has run out of ways and been extended with a spur nobody documented. Neither is automatically dangerous, but neither will pass an inspection either.

Solid walls change the job too. In a terrace with no cavity there is nowhere to hide a cable, so runs have to be chased into brick and made good afterwards. That is part of the reason a rewire in an older Stoke property takes longer than the same job on a newer estate — and why we plaster and make good as part of the price rather than leaving you with a decorator to find.

Because the electrics sit inside a renovation team, the timing works differently as well. On a kitchen or bathroom job the first fix happens the moment the walls are open, not three weeks later when a separate contractor can fit you in.

Newer properties at Trentham, Barlaston and Blurton are usually sound — there the work is adding capacity: EV chargers, garden power, better lighting.

EV Charger Installation
Pricing guide

What does electrical work cost?

Rewires are priced on the number of circuits and points rather than floor area, and older properties cost more because of the chasing and making good.

Everything below includes testing, certification and notification.

Get a Free Quote →
EICR, typical three-bed £150–£250
Additional socket or spur £90–£170
Downlights, per room £250–£550
Consumer unit upgrade £450–£850
Full rewire, three-bed terrace £3,500–£6,000
Common questions

Electrical questions

Do I need a full rewire, or just a new consumer unit?

Often just the board, and we will say so. A new consumer unit brings modern protection to circuits that are otherwise sound, and it costs a fraction of a rewire. A full rewire is the answer when the cable itself has had it — brittle rubber or fabric insulation, no earth on the lighting circuits, or so many additions that nothing can be traced. An inspection tells you which, and it is worth having before anyone quotes.

How long does a rewire take, and how bad is the mess?

Five to eight working days for a typical three-bed, longer in a solid-wall property where every run has to be chased into brick. It is genuinely disruptive — floorboards up, walls open, and dust regardless of how carefully it is done. Most people stay in and live around it. We work room by room where we can so you are never without power overnight, and the making good is included rather than left for you.

How often does a rental property need an EICR?

At least every five years, and before a new tenancy begins if the existing report has expired. You have to give a copy to tenants and to the council on request. If the report comes back unsatisfactory, C1 and C2 items must be put right within 28 days. C3 items are recommendations only — worth knowing before anyone tells you otherwise.

Is your work certificated and notified?

Yes. Notifiable work under Part P — new circuits, consumer units, anything in a kitchen or bathroom — is registered and you receive the certificate. Keep it somewhere safe; it is one of the first things a solicitor asks for when you sell, and reproducing paperwork for work done years earlier is far harder than filing it now.

Can you do the electrics as part of a bigger job?

That is most of what we do. On a kitchen or bathroom the electrical first fix happens while the walls are open, which is both cheaper and tidier than bringing someone back afterwards. It also means one quote and one point of contact rather than coordinating trades yourself.

Need an electrician?

Free quote, certificated work, making good included. Covering Stoke-on-Trent and across Staffordshire.

Areas we cover

Electricians across North Staffordshire

We cover Stoke-on-Trent and the surrounding towns, including the villages around each one.

Stoke-on-Trent Newcastle-under-Lyme Kidsgrove Biddulph Leek Stone Cheadle Stafford Uttoxeter Alsager Congleton Crewe